国产视频www,亚洲天堂一区二区三区四区,亚洲欧美日韩一区二区,一区二区日本视频,七七影院九色桃花78,亚洲国产成人资源在线桃色,日日艹

Transferred from-Mysteel: Tracking the production of the wrong peak of Tianjin Iron and Steel Enterprise

發(fā)布時(shí)間:[2019-1-12 9:23:49]    瀏覽量:3077次
[Introduction]
It is predicted that heavy pollution will occur in our city from January 11, 2019, in line with the yellow warning conditions for heavy pollution weather stipulated in the "Tianjin Heavy Pollution Weather Emergency Plan"(Tianjin Administrative Office Letter[2018] No. 65). A yellow warning of heavy pollution weather is hereby issued.
The people's governments of various districts and the responsible units are requested, in accordance with the division of responsibilities of the "Tianjin Heavy Pollution Weather Emergency Plan", to initiate Class III emergency response measures from 0:00 on January 11 to do a good job in dealing with heavy pollution weather.
[Survey sample profile]

1, the blast furnace survey sample selected a total of 7 parent flow steel mills in Tianjin, 16 blast furnaces, and the total design capacity of blast furnace was 20.3 million tons. At present, 11 blast furnaces are normally produced, and 5 blast furnaces are discontinued. According to the work plan of industrial enterprises in the 2018-2019 heating season of Tianjin, we investigated the production limit rating and actual production limit of various steel companies:


According to the construction of the above-mentioned steel mills, it is estimated that the actual operating rate of the 7 parent flow steel mills in Tianjin is 70 %.

2, rolling line survey samples involved building materials, wire, medium thick plate, strip steel, profile, seamless pipe a total of six varieties, a total of 29 rolling lines.
There are 5 building materials production lines(thread, round steel production lines), 3 normal production, the main production round steel, the discontinued 2 are long-term suspension of production, not affected by the heating season production limit.
There are 6 wire production lines(high lines, variety lines), 2 normal production, and the main production variety lines, 4 discontinued production is a long-term suspension of production, not affected by the heating season production limit.
The production line of medium thick plate is 1, and the output is slightly below the normal level.
There are 8 steel production lines, 7 normal production lines, and 1 production line upgrade.
There are 3 profiles and 1 line production.
Seamless tube production line 6, 1 normal production, adjustment of blank rolling material.

HomeBrief IntroductionOrganizationLetter Bridge NewsProduct CenterAptitude HonorHuman ResourcesContact Us

Mailbox:taxinqiao@163.com    Website:m.y138854.com
Shandong Xinqiao Industrial Co., Ltd.  Copyright         Technical support:Nuodun Network
Headquarters:0538-8151706    Fax:0538-8151704 Address:The new North Road of the steel market of Tai'ant
Branch:0538-5018001      Fax:0538-5018004 Address:Tai'an national Mountain Center

姚安县| 金山区| 宣武区| 银川市| 禄劝| 平邑县| 台南市| 奎屯市| 汾西县| 恭城| 调兵山市| 溧水县| 西华县| 香港 | 咸阳市| 化州市| 白水县| 云南省| 南通市| 丰县| 深水埗区| 博野县| 临颍县| 中阳县| 双江| 巩义市| 克东县| 银川市| 咸宁市| 广河县| 土默特右旗| 江北区| 泸西县| 伊金霍洛旗| 塔城市| 九龙城区| 额尔古纳市| 青州市| 特克斯县| 泗洪县| 保山市|